New Condition AC Fast EV Charger: 220V Electric Car Charging Solution

Still deciding? Get samples of $ !
Request Sample

Product Description

Basic Information
Model NO.:
1
Charging Interfaces:
One Pile with Multiple Charges
Location:
Public Use
Installation:
Floor Type
Charge Method:
Quick Charge
Warranty:
24 Months
Voltage:
220V
IP Rating:
IP54
Transport Package:
Woodencase
Specification:
250*75*385mm
Origin:
China
Product Description
AC Fast EV Charger
EV Charger Detail
Charger View 1 Charger View 2
Charger Detail 1 Charger Detail 2
7kW Basic Parameters
Working voltageAC220V
Frequency50HZ
Rated power7kW
IP degreeIP54
Use Environment
Use environment-25℃~+45℃
Working temperature5%~95%RH
The cooling wayNatural air cooling
Display functionsCharge voltage, current, quantity, fault code
Installation modeColumn mounted or wall mounted
Application Scenario
Technical Layout
Company Profile

Our company was established in 2018 and is a green and environmentally friendly new energy enterprise. We integrate the production of new energy charging piles, the construction of electric vehicle charging station solutions, and the solutions for photovoltaics and energy storage.

As a technical leader in the production and manufacturing of electric vehicle charging pile equipment, our business scope includes power generation, power transmission, and power supply services, as well as the manufacturing and sales of power distribution and control equipment. We adhere to the mission of "creating infinity, quality reaching far" and aim to create the safest and most efficient new energy vehicle charging network.

Facility 1 Facility 2
Frequently Asked Questions
What should I do if charging fails to start?
Re-plug the charging gun and ensure you hear a "click" sound, which indicates the electronic lock has engaged. Ensure the port is clean and dry.
What are the common causes of physical connection issues?
The most common issues include the charging gun not being fully inserted or the presence of foreign objects and oxidation on the gun head or vehicle charging port.
Why does a communication handshake failure occur?
This usually happens due to incompatible communication protocols between the vehicle's BMS (Battery Management System) and the charging pile, or if operator authentication is incomplete.
How can I identify specific faults during operation?
Check the charging app or the pile's display screen for clear error messages such as "Communication timeout," "Insulation fault," or specific fault codes.
What safety protections are built into the charger?
The system includes safety triggers for insulation test failures, electronic lock malfunctions, and voltage irregularities to protect both the vehicle and the user.
What is the operating temperature range for this charger?
The charger is designed to work in environments ranging from -25℃ to +45℃ with a working humidity of 5% to 95%RH, utilizing natural air cooling.

Related Products